Black Diamond Wastewater Infrastructure Upgrade
|
|
View larger version of map. |
A 12-foot diameter in-line storage tunnel would be installed west of the existing King County pump station towards the abandoned lagoon site. A flushing station/odor control facility would be required at the upstream end of the tunnel. A pump would lift flow from the tunnel to a smaller sewer pipe for transport back to the pump station after heavy flows subside.
Alternative C- Storage tunnel