| Building a Beaver Deceiver Description of the Stormwater Control Facility Peterson Pond
Building a Beaver Deceiver The control structure is a concrete channel and contains a weir and shear gate to control the outflow. The fish ladder was provided due to the documented presence of salmon downstream of the pond outlet. Also, a submerged bypass pipe extends into the pond and drains to the control structure. This pipe was intended to maintain the flow in case the main outlet became blocked. Outflow from the pond normally stops in late summer, beginning again after the rains begin in the fall. |