|
|
|
![]() |
|||
| King County's Current SWMP | |||
King County operates under a Phase I National Pollutant Discharge Elimination System (NPDES) General Permit for Municipal Stormwater (the Muni Permit) issued by the Washington State Department of Ecology under the federal Clean Water Act (CWA) and the State Water Pollution Control Act (WPCA). The permit establishes a framework for municipalities with populations of 100,000 or more (as determined by the 1990 census) to further CWA goals by controlling pollutants from stormwater to the maximum extent practicable. The CWA goals include restoring and maintaining the chemical, physical, and biological integrity of our waters (rivers, streams, lakes, wetlands, & marine waters. The WPCA also aims at the protection of groundwater.
The Muni Permit requires the County to develop and implement a Stormwater Management Program (SWMP) that describes what the County will do to meet substantive permit requirements. The current SWMP was developed for July 5, 1995 through July 5, 2000, the Muni Permit term. This permit, and the SWMP created under it, is being continued administratively until Ecology issues a new muni permit, which will likely not occur before 2004.
The King County Stormwater Management Program:
The report text and figures are all provided in version 4 of Adobe Acrobat. For help using Acrobat, please see our Acrobat Help Page.
The complete document is nearly 400 pages long and it contains over 20 color maps and graphics. It has been broken down into sections to reduce download times.
The table below contains links to the individual sections, and it includes a brief description of the contents of each section.
| Title and Size (all are PDF files) |
Description |
|---|---|
| Document Cover (508 KB) |
The Cover of the Stormwater Management Program (SWMP) Document |
| Title Page (5 KB) |
Identifies the geographic areas covered by the document, and includes submittal details |
| Transmittal Letter (46 KB) |
The Revised Stormwater Management Program document was transmitted to the Washington State Department of Ecology on March 24, 1997 |
| Certification (32 KB) |
The Manager of the Agency preparing the SWMP must certify that the document was prepared under his/her direction |
| Table of Contents (10 KB) |
The Table of Contents of the SWMP |
| Foreward (5 KB) |
The Foreward identifies how organizational changes within Metropolitan King County changed some elements of the implementation of the SWMP |
| Executive Summary (22 KB) |
The Executive Summary of the SWMP |
| Chapter 1 Introduction (22 KB) |
Chapter 1 identifies the purpose and applicability of the SWMP, and provides some regulatory context at federal, state, and local levels |
| Chapter 2 Priorities (41 KB) |
Chapter 2 presents King County's stormwater management priorities for the term of the NPDES permit |
| Chapter 3 Problem Identification (70 KB) |
Chapter 3 describes the process King County used to collect and analyze data related to stormwater problems, discusses these problems, and identifies the range of solutions |
| Chapter 4 Program Elements | Chapter 4 presents the major program elements that King County identified for implementation during the permit term.
|
| Chapter 5 Permit Compliance Conditions (97 KB) |
Chapter 5 presents the conditions of the NPDES Permit issued by the Washington State Department of Ecology, and describes how King County's Program Elements (from Chapter 4) address the Permit Conditions |
| Chapter 6 Conclusion (32 KB) |
Chapter 6 confirms King County's commitment to meeting the Clean Water Act goals related to stormwater management, and identifies some important challenges and constraints for stormwater management |
| List of Appendices (7 KB) |
This document lists the five Appendices, and provides links to each of them |
| List of Maps and Figures | This HTML document lists the maps and figures that are referenced in the SWMP, and it provides links to each of them |
|
Related Information: |
|
Links to external sites do not constitute endorsements by
King County. |