Carnation Wastewater Treatment Facility
Home | Type of Treatment Plant | Timeline | FAQs | Project Background / Library
|
 |
Project Updates
Carnation Wastewater Treatment Facility Project Update,
Spring/Summer 2008 (555KB)
Carnation Wastewater Treatment Facility Project Update,
Winter/Spring 2008 (1MB)
View the tour handout of the City of Carnation Wastewater Treatment System. Presented to the Metropolitan Water Pollution Abatement Advisory Committee (MWPAAC) Engineering and Planning (E&P) subcommittee.
September 26, 2007
Carnation Wastewater Treatment Facility Project Update,
December 2006 (375KB)
Carnation Wastewater Treatment Facility Project Update,
June 2006 (318KB)
Carnation Wastewater Treatment Facility Project Update,
Spring 2006 (645KB)
Carnation Wastewater Treatment Facility Project Update,
September 2005 (842KB)
Carnation Wastewater Treatment Facility Project Update
April 2005 (584KB)
Carnation Wastewater Treatment Facility Project Update.
Jan. 2005 (5.7MB)
Posters at community open house (Sept. 9, 2004):
King County/City of Carnation Wastewater Treatment Plant Decision Process,
March 15, 2004 (88KB)
Carnation Wastewater Treatment Facility Project Update.
Fall/Winter 2003 (744KB)
|
 |
Brochures
Carnation Sewer System Owner's Manual, April 2008 (934KB)
This brochure provides sewer tips (including care of the candy cane-shaped air vent in your yard and what is appropriate to put in your toilet and drain) and information on household hazardous waste disposal.
Carnation Wastwater Treatment System,
May 2008 (1.6MB)
Where does it go after you flush, brush or do the dishes?
A step-by-step overview of the Carnation Wastewater Treatment System
Backside of handout: Let's Talk Trash - what belongs in the trash can and not the toilet or drain.
|

 
|
Design
Final Facilities Plan, Carnation Wastewater Treatment Facility, October 2005
Operations Building Design, revised Sept. 22, 2005 - Carnation Wastewater Treatment Facility (41KB)
Proposed Carnation Wastewater Treatment Facility layouts, presented at the Jan. 26, 2005 public meeting.
- Preferred Site Plan - Carnation Wastewater Treatment Facility
JPEG (77 KB), PDF (853KB)
- Perspective Models of Existing and Proposed Buildings - Carnation Wastewater Treatment Facility
JPEG (61 KB), PDF (825KB)
- Preliminary Site Plan - Carnation Wastewater Treatment Facility
JPEG (38 KB), PDF (195KB)
|
 |
Environmental Documents
Carnation Sewer Collection and Conveyance System and Wastewater
Treatment Facility Environmental Assessment (EA) and Finding of No Significant Impact (FONSI), September 2005
Existing Water Quality Conditions in the Snoqualmie River Near the City of
Carnation: 2003-2004 Monitoring Results, April 2005 (792KB)
Environmental Impact Statement (EIS) - Carnation Wastewater Treatment Facility
|
 |
Technical Reports
City of Carnation, Wastewater Treatment Plant, Siting Process Summary Memorandum, July 9, 2003
This memorandum, presented to the Carnation Wastewater Treatment Plant Citizens Advisory Committee on July 9 2003, identifies wastewater treatment system alternatives. Each system alternative will consist of three elements: 1) a treatment plant site, 2) highly-treated wastewater (effluent) conveyance system, and 3) an effluent discharge site, either upland discharge or river discharge. These wastewater treatment system alternatives will be evaluated in more detail in the Environmental Impact Statement (EIS). Engineering evaluations of the system alternatives will be completed in support of the EIS document, along with scientific and regulatory evaluations.
Technical Memorandum (text portion 216KB)
Figures for this memorandum
Appendix A (104KB)
Appendix B (4.5MB)
Appendix C (6.5MB)
Appendix D (6.7MB)
|

|
King County Wastewater Service to the City of Carnation, September 2001
Source: Wastewater Treatment Division Conveyance System Improvement Program.
This report presents an alternative financing proposal to the City of Carnation for King County to provide wastewater treatment services to the city under a contract similar to the countys other component agencies.
Report (1.3MB) |