|
CSO Water Quality Assessment
This study was completed in 1998 with help from a large stakeholder group and the Water Environment Research Foundation (external link).
King County Combined Sewer Overflow Water Quality Assessment for the Duwamish River and Elliott Bay, February 1999
Volume 1: Overview and Interpretation, February 1999, (8.4 MB)
Volume 2: Public Information Document, August 1999, (4.2 MB)
Volume 3: Stakeholder Committee Report, January 1999, (224 KB)
Volume 4: WERF Peer Review Committee Report (not available online) Back to top. |