Denny Way CSO Project - Phase II Environmental Site AssessmentBack to Project LibraryNote: These documents require the Adobe Acrobat Reader. The instructions and software are provided in the PDF guide The purpose of the Phase II ESA was to identify and confirm the presence or absence of contaminated soil and groundwater to the extent feasible along the Denny Way/Lake Union CSO project corridor, so that contamination likely to be encountered could be adequately addressed during the final design. Phase II Env. Site Assessment Report (PDF file) |