King County Navigation Bar (text navigation at bottom)
Welcome to the King County Wastewater Treatment Division Web Site image as link to King Co. DNR and WTD to Wastewater Treatment home page to King Co. Natural Resources and Parks home page

Home

Project
Information

News and
Newsletter

Contract
Bids

Team
Information

Document
Library



Photos & Drawings


Signs

Denny Way CSO Project - Phase II Environmental Site Assessment

                   Back to Project Library

Note: These documents require the Adobe Acrobat Reader. The instructions and software are provided in the PDF guide

The purpose of the Phase II ESA was to identify and confirm the presence or absence of contaminated soil and groundwater to the extent feasible along the Denny Way/Lake Union CSO project corridor, so that contamination likely to be encountered could be adequately addressed during the final design.

Phase II Env. Site Assessment Report (PDF file)
Figure 1 from Report (PDF file)


For more information, e-mail or call Yvonne Kraus, community outreach coordinator,
206-269-0229, ext. 12.

Yvonne Kraus
Norton-Arnold & Co.
1932 First Ave., Suite 510
Seattle, WA 98101
Fax: 206-269-0249

Updated: November 12, 2001


King County | Natural Resources & Parks | Wastewater Division
News | Services | Comments | Search

Links to external sites do not constitute endorsements by King County.
By visiting this and other King County Web pages, you expressly
agree to be bound by terms and conditions of the site.
The details.