As part of its mission to protect public health and the environment, King County is responsible for conveying and treating wastewater collected by 34 local city and sewer agencies, including the City of Seattle. Many of the county’s sewers and pump stations are more than 40 years old and need to be upgraded to ensure reliable operation. Some facilities must also be expanded to provide additional capacity or modified to meet more stringent regulations.
During heavy rains when flows exceed the capacity of the sewer system, the system can overflow into Puget Sound at South Magnolia. When this happens, about 90 percent of the combined volume of the overflow is storm water and the rest is diluted sewage. These events are called combined sewer overflows, or CSOs. From 2000-2007, the South Magnolia CSO discharged on average 18 times each year, a total of 30 million gallons per year.
CSOs help to avoid sewer backups into homes and businesses and onto streets, but CSOs can be a public health and environmental concern. King County's goal is to reduce the number of CSOs each year, with a long-term goal of less than one untreated discharge per location per year to meet state regulations.
To protect Puget Sound, the county is in the process of identifying CSO control options for North Beach, West Seattle, and South Magnolia. These locations are top priority, because they are where people are most likely to come in contact with water during recreational activities such as swimming.
Although the sewage in CSOs is greatly diluted, CSOs may be harmful to public health and aquatic life because of bacteria and viruses found in sewage.
|
The map shows the area draining to South Magnolia and nearby facilities. At South Magnolia, CSO control options may include:
These options can be used alone or in combination, depending on local conditions at South Magnolia.
2007–2008 |
Evaluate alternatives for reducing CSOs |
|
2009–mid-2010 |
Predesign and environmental review |
|
2010–2011 |
Final design and permitting |
|
2012–2013 |
Construction |
The county is committed to working with the local communities to evaluate alternatives and address suggestions and concerns. We will work with the public to identify potential community and environmental impacts early in the environmental and design review processes. Our public information and involvement program will continue throughout design, construction and operation of the facilities.
>> back to top
>> back to top
|
|
||
|
Department of Natural Resources and Parks Updated: April 11, 2008
|
||
|
King County | Natural Resources & Parks | Wastewater Treatment Division
Links to external sites do not constitute endorsements by King
County. |
||